Two weeks of home improvement.
Why does it always go more slowly than I hope. My bathroom is now painted, but I still need to do some detail work. However, the new cabinet is in place, the new sink, the new toilet, I've fixed the area above the stall, mostly. The room is painted fairly well. The door still hasn't been put on. I do have the new hingers, and the new door, just need to cut the holes for the handle and hang it in the frame.
New door has to be put on the far bedroom. I'm looking forward to that.
Master bedroom has had the walls painted, the window trim is done, the door and the baseboards and the ceiling still has to be done.
In the kitchen, nothing has happened. Need to get that started too. [img_assist|nid=10|title=Master Bedroom|desc=|link=none|align=center|width=100|height=75]